ELECTRIC RATES

as voted by Hull Municipal Light Board, effective 05/01/25

Electric Rates

Customer Charge Distribution Charge Purchase Power Charge
Residential $9.11 $0.0942/kWh $0.100
Small Power $12.15 $0.0880/kWh $0.145
Large Power $106.34 $13.55/kWh $0.145
Municipal $8.28 $0.0869/kWh $0.100
Temporary Service $27.44 $0.1215/kWh $0.100
Area Lights (250 watts) $35.24
Area Lights (400 watts) $49.92
Minimum Monthly Bill Net Metering Credit
Residential Solar $4.05 per installed kW per month Residential Customer Charge + Installed kW Charge HMLP credits customer monthly day ahead on peak LMP at the SEMA load zone. Credits expire at the end of the calendar year.

Detailed Rate Information

REGULAR RESIDENTIAL

Electricity is available under this schedule for all residential purposes in an individual residence or an individual apartment. Electricity is also available for farm use.

Customer Charge: $9.11 per month
Distribution Charge: $0.0942 per kWh
PPC: As per MDPU #50

SMALL POWER

Electricity is available under this schedule for all general service purposes to any single-phase customer with less than 10 kW of demand.

Customer Charge: $12.15 per month
Distribution Charge: $0.0880 per kWh
PPC: As per MDPU #50

LARGE POWER

Electricity is available under this schedule for all purposes to any customer with greater than 10 kW of demand or for any three-phase customer.

Customer Charge: $106.34 per month
Distribution Demand Charge: $13.55
PPC: As per MDPU #50

MUNICIPAL POWER

Electricity is available under this schedule for all municipal facilities other than street lighting, security lighting, and traffic signal systems within the service territory of HMLP.

Customer Charge: $8.28 per month
Distribution Charge: $0.0869 per kWh
PPC: As per MDPU #50

MUNICIPAL LIGHTING

Service is available under this schedule for all municipal street lighting, security lighting, and traffic signal lighting systems within the service territory of HMLP.
Calculated by multiplying the kilowatt-hours used during the month times a rate which is determined annually.

TEMPORARY SERVICE

Electricity is available under this schedule for temporary service to contractors during construction or renovation to property within the service territory of HMLP.

Customer Charge: $27.44 per month.
Distribution Charge: $0.1215 per kWh
PPC: As per MDPU #50

FLOOD LIGHTS

250 Watt – $35.24
400 Watt – $49.92

NET METERING POLICY

Distribution Charge: $4.05 per kilowatt of installed solar generation capacity per month
Minimum Monthly Bill: Customer Charge + Installed kW charge
Net Metering Credit: HMLP credits customer monthly day ahead on peak LMP at the SEMA load zone. Credits expire at the end of the calendar year.

FIXED MONTHLY CHARGE FOR WINTER GENERATORS

The generator surcharge will be in effect starting with the September 2025 billing period and will last for one year, concluding with the August 2026 billing period. The surcharge will raise $823,545.24 to pay for renting six generators for the winter months. This surcharge is in addition to the standard monthly fixed charges.